Who should build the new hearth?
A fireplace remodel touches three trades at once: masonry or tile on the face, carpentry for the mantel and any built-ins, and gas and venting behind it all. Owners in Dana Point often start by calling whoever did their kitchen. That works well for the tile. It does not always work for the parts behind the tile, and those are the parts that can hurt someone.
Here is who usually does what, where the gaps between trades open up, and what a written scope from any of them ought to contain.
The trades and what each brings
- A tile setter or stone mason. Strong on the face: layout, cuts, grout lines, how a slab turns a corner. Often not set up to judge a flue, size a liner or read a gas appliance listing.
- A general contractor. Runs the whole room and brings the subs together. The fireplace is one line in a larger job, and the firebox work is usually passed to someone else.
- A finish carpenter. Builds the mantel and shelving. Needs the clearance numbers before the first cut.
- A chimney and fireplace company. Knows the firebox, the flue, the damper, the insert listings and the clearances, and can either build the face too or work beside your tile setter.
Wakeley Chimney Group sits in that last group and also builds the face. Owners who already have a favorite tile setter still hire us for the firebox, liner and gas side, then hand over a clean opening with the clearances marked on the wall.
Where things go wrong between trades
Most of the remodels we are asked to put right were not bad work by any one trade. The trouble lay in the handoffs.
- A handsome oak beam set too low over a gas insert, because nobody read the clearance chart before mounting it.
- New porcelain laid over a hearth too short for the opening, so a stray ember from a wood fire lands on the floorboards.
- An insert set with no liner, venting into an old clay flue sized for wood smoke.
- Stone veneer glued over brick that was damp from a crown leak, which then stained through the stone.
- A face finished before the gas line was run, so the tile had to be cut open again.
Each of those costs more to undo than it would have cost to plan.
What a sound written scope covers
Whoever you hire, the scope on paper should answer these points. If one is missing, ask about it before signing.
- The fire. Open wood, log set, insert or built-in, with the make or at least the size range.
- The venting. Liner size and length for an insert, the vent route for a built-in, or the state of the flue for an open fire.
- Clearances. Mantel height, side trim distance and hearth depth, taken from the unit's listing or from the code minimums.
- The face. Material, thickness, how it is fixed, and what comes off first.
- Gas and power. Who runs them, and whether they are in the figure.
- Surprises. What happens if demolition turns up cracked firebrick, a rusted damper or wet brick behind the old face.
What sets our figure on a remodel
Refacing and mantel work have no list figure, because each wall differs. We measure, you choose materials, and the scope shows each part with its own figure. The gas fire options do have ranges on our price list: a sealed insert in the opening you have runs $2,700 to $5,450, and a new direct-vent firebox on a fresh wall runs $4,350 to $8,750. Before either, a $380 Level 2 survey shows what the flue can take.
If you want a scope you can hold against other bids, request a written remodel scope. Say whether another trade is already doing the tile, and we will price only our share.
Comparing bids fairly
Two remodel bids can sit thousands of dollars apart and both be honest, because they describe different jobs. Line them up against the scope list above. A low bid that skips the liner, leaves the clearances blank or assumes the old hearth is deep enough is pricing a smaller job. A high bid that includes structural work on the chimney may be pricing a problem the other bidder never looked for. The camera report settles that argument with pictures.
Signs you are talking to the right crew
- They want to look up the chimney before they talk about tile.
- They ask what you plan to burn, and how often.
- They name the clearance numbers for the unit they suggest.
- They tell you plainly when a material will not suit the spot, such as raw steel a short walk from the ocean.
- They put each part of the figure on its own line.
Fitting in with a remodel team
Many of our jobs in Dana Point and San Clemente are one piece of a larger room remodel. We fit around the other trades: firebox and gas work first, then a marked-up opening for the tile setter, then our final checks and a test fire once the face is complete. Our fireplace remodel page lists what we can take on, and what a fireplace remodel costs covers the budget side.
Start the conversation
Whether we build the whole hearth or only what sits behind it, the opening move is the same. Use the contact page to tell us who else is on the job and what you hope the finished wall will look like.
Weighing This for Your Own Home?
Wakeley Chimney Group measures, brings samples and puts the price in writing before any work starts. We work from Dana Point across Laguna Niguel, San Clemente, Laguna Beach and the rest of Orange County.





